More facework

facade1

The facade is scheduled to be unveiled next week, and details have started to emerge from it. Above, recessed lighting.

facade2

The arched main entry.

facade3

The front-facing windows have been installed on the second floor.

facade4

The front-facing windows on the third floor are next.

facade5


Posted

in

by